home home      profile      services     sectors     News      Careers      Contact

Community 21 Housing Project

In June 2017 McAdam Design were appointed as water and wastewater designers for established Ghanaian developer, contractor and utility company owner, LMI Holdings.

The Community 21 Housing Project comprises the design and construction of the 600 No. houses and related infrastructure by LMI Holdings and Murphy Construction.

McAdam Design have recently completed the sewer network design for the project and are currently carrying out the detailed design of a wastewater package plant for the project.

Water modelling and water system are also ongoing at due for completion by the end of September 2017.

Dawa Industrial Park

LMI Holdings have appointed McAdam Design to provide consultancy services for their development of the Dawa Industrial Park, a 820 ha US$150 M privately funded infrastructure project. The site, located 40 km from the capital Accra, has been zoned with a mix of heavy/light industry, food processing and commercial activities.

Dawa is the latest industrial park to be developed by the client who has already constructed a number of similar Free-Zone industrial sites in the Tema Port area.

The water infrastructure design by McAdam Design for the Dawa Industrial Park will include comprise demand/supply analysis, water modelling, on-site water storage (reservoirs) and pumping stations. Future developments may comprise the construction of an on-site water treatment works.

The water system design comprises the creation of a water network model to provide flexibility in the build-up of the industrial park which will be dependent on the type of industries that locate at the Dawa site.

back