McAdam, with support from Amphora, acted as civil and structural designers for BSG on this new service reservoir for Longwood, Co Meath. Uisce Éireann identified that this site had only 6 hours of storage for it's supply zone and that a new reservoir and treatment process was required at this site.
The new 500m3 reinforced concrete reservoir was built on a constrained, sloping site with the design and build team working well to collaboratively address and integrate the new reservoir, pipework and MEICA equipment.
This project will provide 500m3 of much needed storage in the area providing enhanced security of supply to the water supply zone.